SUNIFY GROUP INC. — RENOVATION SCOPE & QUOTE COMPARISON Planning worksheet | North Vancouver, West Vancouver & Greater Vancouver Website: https://www.sunifygroup.ca/ This blank worksheet is a planning aid, not a quotation, contract or approval. No email signup is required. Keep sensitive personal information private. 1. PROJECT BRIEF Municipality (City and District of North Vancouver are different): Property type: Rooms and approximate renovated area: Current problems and desired outcome: Retain layout or propose changes: Occupied during work: Preferred timing: Optional total budget: 2. APPROVALS AND RESPONSIBILITIES Required drawings / design — responsible party and status: Engineering or specialist assessment — responsible party and status: Municipal permits / inspections — responsible party and status: Strata approval / alteration agreement — status: Building access, work hours, deliveries and elevator arrangements: 3. COMPARE THE SAME SCOPE For each item record: Included / Excluded / Allowance / Not yet priced. Then record specification, supplier, installer and any unresolved questions. Demolition and disposal: Protection and cleanup: Framing, structural and substrate work: Moisture or hazardous-material assessment / specialist work: Electrical / plumbing / gas / ventilation: Waterproofing assembly and any required tests: Cabinetry and installation: Counters, templating, cutouts and installation: Fixtures, glass and appliances: Tile, flooring and preparation: Doors, trim, drywall and painting: Design, engineering and permit fees: Access, parking, delivery and building charges: Owner-supplied items: Taxes and other stated exclusions: 4. BUDGET SUMMARY — AVOID DOUBLE COUNTING Construction subtotal: Items already included in that subtotal: Excluded professional / permit costs: Owner purchases not already included: Applicable taxes not already included: Temporary living / storage arrangements: Owner-controlled reserve for uncertainty: Refundable deposits (record separately from costs): Total based on the above: 5. BEFORE ACCEPTING Are both quotes based on the same drawings and specifications? What is provisional, and how are allowance differences calculated? What conditions could change the price? Who approves scope changes, and how are they documented? What are the agreed payment milestones and warranty terms? What relevant work evidence and current documents have been provided? What must be decided before ordering, demolition and installation? To discuss a Sunify project, use the relevant service page or contact options. The website form does not upload files. Photos may be texted or emailed. Do not treat a completed worksheet as permit or strata approval.