Kitchen Renovation Costs in Vancouver & the North Shore
Published contractor examples put a full Vancouver condo kitchen at CAD $35,000–$70,000 (Domicile) and a West Vancouver kitchen renovation at CAD $60,000–$120,000+ (QUAY). These are external industry examples reviewed on 23 October 2026, not Sunify prices or a Metro Vancouver average. The scopes differ: decide what stays, what changes and what the written quote includes before choosing a budget.
Prepared by Sunify Group Inc. · Sources reviewed
Published cost examples — compare the scope
Published contractor planning examples, not Sunify prices, quotes, a market average, or directly comparable packages. Amounts are Canadian dollars. Each source defines its own scope; unless expressly stated, tax treatment, appliances, design, permits and other inclusions have not been independently reconciled. Confirm them in a project-specific written quote.
West Vancouver kitchen renovation
CAD $60,000–$120,000+
QUAY’s 6 February 2026 guide lists cabinetry, layout changes and appliances. Custom cabinetry, wall removal and service relocation affect scope. Reviewed 23 October 2026; tax, design and permit inclusions are not reconciled.
QUAY Construction — West Vancouver contractor cost guideFull Vancouver condo kitchen renovation
CAD $35,000–$70,000
Domicile’s published full condo-kitchen estimate, reviewed 23 October 2026. Its table does not itemize allowances or tax, appliance, design and permit inclusions. Confirm these; this is not a detached-home package.
Domicile Construction — Condo renovation pricing| Published scope | CAD range | Source and limits |
|---|---|---|
| West Vancouver kitchen renovation | $60,000–$120,000+ | QUAY’s 6 February 2026 guide lists cabinetry, layout changes and appliances. Custom cabinetry, wall removal and service relocation affect scope. Reviewed 23 October 2026; tax, design and permit inclusions are not reconciled. QUAY Construction — West Vancouver contractor cost guide |
| Full Vancouver condo kitchen renovation | $35,000–$70,000 | Domicile’s published full condo-kitchen estimate, reviewed 23 October 2026. Its table does not itemize allowances or tax, appliance, design and permit inclusions. Confirm these; this is not a detached-home package. Domicile Construction — Condo renovation pricing |
Sources can describe very different projects. We do not average these ranges, promise to match them or apply a universal West Vancouver surcharge.
Is a kitchen renovation price list the same as a quote?
No. A published price list is a planning reference, not a price for your kitchen. A cabinet supply price, an installation charge and a full-room renovation package can cover different work. Confirm the dimensions, quantities, specifications and exclusions before comparing them, and do not add a line item to a package if it is already included.
Ask each contractor to price the same written brief. Separate the contractor’s included work from owner purchases, professional or permit costs, applicable taxes and any other excluded items. Keep a reserve for unresolved work visible rather than treating it as an amount already spent. Our quote-comparison worksheet gives you a place to record these categories.
Check how the price is calculated, too. A fixed-price proposal and an estimate based on actual costs are not the same commitment. Ask what could change the amount, how selections or scope changes are approved, and how they affect timing and payment. CHBA’s homeowner guidance explains these contract distinctions; it does not establish Sunify’s prices or the terms of your project.
Official guidance: Canadian Home Builders’ Association — A One-Stop Guide to Renovation Contracts
Planning a CAD $25,000–$100,000 kitchen project
Treat your available budget as a scope decision, not a contractor price promise. In the lower part of this planning window, ask what can be retained and what a phased refresh would leave unfinished. Neither published example above establishes a full-remodel price at $25,000.
For a larger investment, compare a complete replacement in the current layout with an island or wall-and-service reconfiguration using the same cabinet and appliance specifications. Prioritize storage, usable work surfaces and the changes you need before upgrading every finish. If your kitchen work connects to flooring, a bathroom or adjoining rooms, ask for a coordinated scope rather than separate totals with overlapping work.
Build a scope before choosing a budget bracket
Write down what will be retained: cabinet boxes, layout, appliances, flooring, windows and doors. Then list what must be replaced. A quote for new doors on existing cabinet boxes cannot be compared directly with a quote for new cabinetry and a revised layout.
For an island, specify its intended use, seating, dimensions and whether it needs a sink, cooking appliance or power. Ask the team to identify the feasibility and qualified-trade work before treating an inspiration image as an approved plan.
Separate allowances from fixed specifications
Request the cabinet specification, countertop material and thickness, edge treatment, backsplash area, appliance models and installation responsibilities. A small allowance can make a total look attractive while leaving much of the eventual purchase unresolved.
A useful comparison sheet has four columns: item, included specification, allowance or fixed price, and exclusions. Record countertop fabrication, cutouts, templating, delivery, installation and disposal explicitly. Ask who supplies each item and who carries the risk if an owner-supplied item does not fit.
What should a kitchen renovation quote include or exclude?
Ask the written scope to identify protection of occupied rooms, demolition and disposal, cabinet supply and installation, countertop fabrication and cutouts, backsplash, flooring transitions, painting and finishing. Include appliance delivery and installation responsibilities, lighting, ventilation, and any plumbing or electrical work. These are comparison items, not a claim that every published range includes them.
Record the cabinet construction and hardware, countertop specification, appliance models, quantities and allowances. Mark each item as included, owner-supplied, an allowance or excluded. Separate design and engineering, permit fees and coordination, strata-related deposits or access charges, taxes and work outside the kitchen.
Ask how concealed damage, hazardous-material assessment or remediation, service upgrades and change orders would be handled if needed. Keep any owner contingency separate from the contractor total. Do not add a generic contingency percentage and assume it covers every unresolved condition.
Retained layout versus wall and service changes
Changing the layout can affect more than cabinets. The comparison should include any required structural design, work around the opening, flooring repairs, electrical changes, plumbing relocation and ventilation route. It should not assume that a wall can be removed from a photograph.
Kitchen permits: Vancouver, North Vancouver and West Vancouver
City of Vancouver: its permit guidance distinguishes simple cabinet or flooring replacement from renovations that move interior walls or existing plumbing, electrical or gas lines. Check the exact scope with the City; a replacement kitchen is not automatically exempt from every trade or building requirement.
City of North Vancouver: use its separate residential non-strata or strata renovation application guidance for the property type. The District of North Vancouver is a different authority; confirm the property’s jurisdiction and current requirements directly with the District rather than applying City instructions.
District of West Vancouver: its building-permit guidance separates single-family, multi-family and trade permits, and directs gas-permit questions to Technical Safety BC. For a condo, obtain the building’s renovation instructions and confirm strata and municipal requirements separately. No estimate, budget range or guide guarantees approval, fees or a permit timeline.
Official guidance: City of Vancouver — When you need a permit · City of North Vancouver — Residential renovation and addition, non-strata · City of North Vancouver — Residential renovations, strata · District of West Vancouver — Building Permits and Inspections
Protect the budget before demolition
Ask for a sequence that separates selections, approvals, ordering, demolition, installation and handover. Cabinet delivery and countertop templating should be considered before the existing kitchen is removed. Agree how you will cook, store food and access occupied rooms during the work.
Keep a separate owner-controlled reserve for unresolved conditions and selection changes. Its size should reflect the particular project, not a percentage presented as sufficient for every home. Record changes in writing before approving the extra work.
What to discuss for your North Shore property
For an Ambleside, Dundarave, Lonsdale or other North Shore property, provide the actual access and building constraints: stairs, parking arrangements, delivery routes, work-hour rules and whether the home stays occupied. A neighbourhood name alone does not establish a cost premium.
Sunify’s project discussion starts with your current kitchen and priorities. Published figures above are research context only. A Sunify quote requires an agreed scope, selections and an appropriate site review; it does not borrow another contractor’s price.
Prepare a useful project brief
- Current photos and approximate kitchen dimensions
- Retain layout or propose an island, wall or service change?
- Cabinet, counter and appliance preferences or specifications
- Exact municipality and any strata renovation instructions
- Rooms and flooring affected beyond the kitchen
- Owner-supplied items, preferred timing and optional budget range
Start with photos and a description. Do not send identity documents or sensitive property records through a public comment. Our website form does not upload files; photos can be texted or emailed through the contact options.
Planning work beyond the kitchen?
Sources and how to use this guide
Municipal and provincial links are the starting point for checking requirements. Contractor examples are their own published estimates, not Sunify projects or independently audited market data. This guide is not an approval, legal opinion or fixed quotation. Check current requirements for the actual property and proposed work.
- Official guidance: Canadian Home Builders’ Association — A One-Stop Guide to Renovation Contracts
- Published contractor example: QUAY Construction — West Vancouver contractor cost guide
- Published contractor example: Domicile Construction — Condo renovation pricing
- Official guidance: City of Vancouver — When you need a permit
- Official guidance: City of North Vancouver — Residential renovation and addition, non-strata
- Official guidance: City of North Vancouver — Residential renovations, strata
- Official guidance: District of West Vancouver — Building Permits and Inspections