Bathroom Renovations & Primary Ensuite Remodelling
Sunify Group Inc. provides bathroom renovation and primary-ensuite remodelling across Vancouver, North Vancouver, and West Vancouver. Build the scope around the room you need: a full bathroom update, a walk-in shower, a larger vanity, or a coordinated premium finish package.
A bathroom is more than visible tile. We plan the substrate, waterproofing assembly, ventilation, fixture compatibility, and construction sequence alongside the finishes. Regulated plumbing and electrical work is undertaken by appropriately licensed trades where required.
Request a Bathroom Estimate
Tell us about your bathroom renovation project. We respond fast.
Text photos for a faster estimate. WorkSafeBC registered and insured.
Bathroom Renovation services we provide
- Full bathroom remodels and primary ensuite updates
- Tile floors, walls, shower niches, and compatible waterproofing assemblies
- Vanity, countertop, mirror, and storage installation
- Walk-in showers and custom glass coordination
- Tub-to-shower conversion subject to layout and drainage review
- Heated-floor and lighting coordination with qualified electrical trades
- Ventilation and plumbing coordination, permits where required
- Accessibility-focused layout options assessed for the actual user and space
Sound familiar?
- A dated bathroom needs a complete coordinated update
- Shower and vanity layout wastes useful space
- Finish choices are being made before waterproofing details are resolved
- You need a comfortable ensuite without an unsupported one-size-fits-all package
- Existing moisture or hidden damage must be assessed before new finishes
For a strata bathroom in the City of North Vancouver, start with the City’s residential strata renovation guidance. This is City guidance, not District of North Vancouver guidance.
For a West Vancouver condo, review the District’s multi-family permit and interior-renovation checklists for the documents relevant to the proposed work.
For a property in Vancouver, the City’s plumbing permit guidance explains plumbing changes and listed exceptions; other approvals still depend on the scope.
Health Canada’s guide to ventilation and the indoor environment explains equipment, ductwork, and retrofit considerations for homes with their own ventilation system; it is not a project-specific design or condo approval.
For a smaller repair rather than a remodel, see tile, grout, and caulking repairs.
For an apartment, review our condo renovation service for strata and access planning.
Combining several rooms? Explore coordinated whole-home renovations.
Planning your budget? Read our bathroom and ensuite budget guide to compare scope, allowances and the questions to settle before a quote.
Bathroom refresh or full renovation: which scope fits?
For a finish refresh, identify what you want to retain as well as replace: the tub or shower, tile, vanity, storage, mirror, and lighting. A new vanity still needs its dimensions, plumbing connections, wall condition, and surrounding finishes checked. A small visible change does not establish that all hidden work can stay untouched.
For a full remodel, include removal and disposal, the surfaces to be rebuilt, the shower or tub assembly, fixture supply, ventilation, and finishing. Mark any proposed fixture moves separately. This gives us a useful starting brief rather than an assumption that every item is included in a bathroom package.
If the concern is limited to worn caulking, damaged grout, or a small tile repair, start with a targeted repair enquiry. A full renovation is not automatically the right answer.
West Vancouver ensuites and North Shore bathroom remodels
From a family bathroom to a primary ensuite, the project starts with dimensions, daily use, storage, and maintenance preferences. A premium result can involve better planning and coordinated details rather than simply adding the most expensive fixtures.
Before planning the work, identify the municipality for the property: the City of North Vancouver, District of North Vancouver, and District of West Vancouver are separate authorities. Describe the proposed changes rather than asking whether a bathroom renovation always needs a permit.
Walk-in showers, waterproofing, and heated floors
A low-threshold or curbless shower depends on the available floor depth, drainage, structure, and specified waterproofing system. We assess the proposal before promising a flush shower entry. Tile and grout alone are not a substitute for the required waterproofing assembly.
Heated-floor systems, new lighting, and plumbing changes are coordinated with the relevant qualified trades. Custom glass is measured against the completed installation sequence, and material cure requirements are included in planning.
Keep the layout or change the whole room?
Retaining fixture positions can simplify the scope, while moving a toilet, shower, or wall can add design, trade, and inspection work. We explain the differences so your budget follows the work that matters to you.
Suspect materials or concealed damage must be assessed before disturbance or covering. Specialist hazardous-material or mould remediation is not automatically included in an ordinary bathroom renovation.
What should the bathroom ventilation scope include?
Separate replacing the fan from changing the ventilation system. Ask whether the quote includes only the fan unit or also checking the existing duct route and outdoor discharge, controls, electrical connections, access, and any ceiling repairs. A new fan alone does not establish that the existing ductwork is suitable.
Before a site review, note persistent condensation, unusual fan noise, or visible staining and share an accessible photo of the fan grille. These observations help frame questions; they do not diagnose the cause. Do not open ceilings or disturb suspect materials to prepare an estimate enquiry.
For a condo, identify whether the bathroom connects to a shared system and ask the building manager about approval requirements before choosing equipment. For a home with its own system, have the ventilation arrangement assessed alongside the proposed renovation. Record any investigation, trade work, and making-good that is excluded from the initial quote.
Bathroom renovation approval checklist
List what stays and what changes: fixture positions, drains and supply lines, lighting or heated floors, ventilation, and any walls. Use that scope to ask the relevant municipality which building or trade permits, drawings, and inspections apply before demolition.
For a strata property, ask for the renovation approval requirements, permitted work hours, water-shutoff arrangements, and rules for moving materials and debris through shared areas. Municipal requirements and building rules should both be checked; one approval should not be assumed to cover the other.
Record who will prepare applications, arrange required inspections, and obtain any strata approval in the written scope. The official resources linked above are starting points for those questions, not confirmation that a particular project is approved.
A contractor that shows up — and shows up clean
Insured to $2M
Strata- and adjuster-friendly.
Family-Run
Local, accountable, personally invested.
Written Quotes
Itemized and transparent. No surprises.
Workmanship Warranty
Written warranty provided where applicable.
Predictable, professional, no surprises
- 01
Project brief
Share the rooms, municipality, approximate size, priorities, and preferred timing. Photos help us prepare for a site review; they are not a fixed-price construction quote.
- 02
Site and feasibility review
Review existing conditions, access, occupancy, design information, and any engineering, strata, or permit requirements before confirming the construction scope.
- 03
Written scope and selections
Separate labour, materials, allowances, specialist work, exclusions, and payment milestones. Confirm responsibility for drawings, permits, and selections in writing.
- 04
Coordinated construction
Schedule agreed work and required inspections. Regulated work is undertaken by appropriately licensed trades. Changes to the agreed scope require written approval.
- 05
Completion and handover
Review finishing and outstanding items, and provide the agreed project documentation. Applicable workmanship-warranty terms are recorded in the contract.
Honest pricing — quoted in writing
Bathroom renovation cost depends on size, tile and glass, vanity and fixture selections, waterproofing details, layout changes, and existing conditions. We distinguish construction, supply allowances, specialist work, and exclusions. Photos begin the discussion; an invasive or full-room renovation needs an appropriate site review before a final quote.
What to send for a bathroom renovation estimate
Clear photos and a few details help us assess the work and prepare an initial estimate. Text photos to (778) 522-1810, or use the form to describe your project. We'll confirm whether an on-site assessment is needed.
- Bathroom photos and approximate dimensions
- Current and proposed tub, shower, vanity, and toilet positions
- Tile, glass, vanity, and fixture preferences
- Municipality and any strata renovation requirements
- Known moisture or hidden-condition concerns
- Preferred timing, other available bathrooms, and optional budget
Bathroom Renovation — common questions
Have a different question? Call or text (778) 522-1810.
Send a wide photo from the doorway, photos of the shower or tub and vanity, approximate room dimensions, your municipality, and a short list of what stays and what changes. Tell us if it is your only bathroom or a strata property. Photos help establish the initial scope; concealed conditions, dimensions, and trade requirements may still need a site review before a final written quote.
Tell us before scheduling if you have no other usable toilet or shower. Agree on alternative facilities or accommodation before demolition; keeping the bathroom usable throughout a full remodel should not be assumed. Ask for a sequence covering material availability, required approvals and inspections, waterproofing and finish cure times, and when each fixture can return to use. The schedule depends on the agreed scope and site conditions rather than a fixed number of days for every bathroom.
We can scope a primary ensuite with selected cabinetry, tile, glass, and fixtures. Specific features, specialist work, and allowances are agreed after assessing the room; no premium package or fixed price is assumed.
We can assess the layout, drain location, floor construction, waterproofing, and approvals needed. Feasibility is confirmed before promising a curbless or particular shower configuration.
Regulated work is undertaken by appropriately licensed trades where required. Sunify coordinates the agreed construction package rather than claiming every trade licence in-house.
Yes, with the project scoped around current strata rules, required approvals, access, and shared services. We provide contractor documentation on request.
A targeted repair may be more appropriate than a complete remodel. Use our separate tile, grout, and caulking service for a smaller finish-repair enquiry.
Service areas
You might also need
Kitchen Renovation
Full kitchen remodelling in Vancouver, North Vancouver and West Vancouver.
View details →Condo Renovation
Condo renovations in North and West Vancouver: kitchens, bathrooms, flooring and full interiors, with strata documents and building-access planning.
View details →Whole-Home Renovation
Coordinated whole-home renovations in North and West Vancouver.
View details →Tile & Grout Repair
Localized tile, grout and tub/shower caulking repair across Greater Vancouver — cracked or loose tile, worn grout, and failed sealant fixed and matched.
View details →Ready to start your Greater Vancouver project?
Serving all of Greater Vancouver. Request an estimate from a trusted, insured Greater Vancouver contractor. No pressure, no surprises.